Log of shop projects and general changes within the Wood and Metal shops.
Month
June 2023
- Additional lighting in wood shop
- 4x 4' LED fixtures over CNC/lathe area and Tool Island/sanders
- Switch added for overhead 24" fan
- Compressor wiring added in
- Partial air system in progress
- Safety station upgraded to have PPE storage
- Sandblaster assembled by Ryan C
- CCTV Replacement finished
May 2023
- Upgraded 2 strands of lights in the wood shop to LED
- CCTV Replacement started
April 2023
- Dust Collection Pipe run
- 6" Main trunk with 4" connections down to tools
March 2023
- Large trash can donated by Chris N and set in wood shop.
- Damaged motor cord on planer. Found and fixed by Shane G, Chris K, Bret L.
February 2023
January 2023
- Consolidation panic
- Tools shifted from Unit 2 over
- New Metal shop electrical mostly stubbed out
- Subpanel split off for metal shop