Difference between revisions of "Workspace/officelog"
(→Month) |
(→Month) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
==Month== | ==Month== | ||
+ | ===September 2023=== | ||
+ | *Laser water loop flow sensor is leaking. Did some temporary repairs | ||
+ | **Identifying the sensor type to order replacement | ||
+ | *Bathroom light fixture replaced | ||
+ | *Kitchen cabinet screwed back to wall (Appeared to be coming loose) | ||
+ | *Excess material purged from Electronics room | ||
+ | |||
+ | ===August 2023=== | ||
+ | *Rooftop AC Unit Failure | ||
+ | **Portable AC units spread out in the space as a stopgap | ||
+ | **Putting plan together to replace | ||
+ | *Refrigerator evaporator fan replaced | ||
+ | |||
+ | ===July 2023=== | ||
+ | *Replaced ballasts with LED conversions in 4 fixtures | ||
+ | *Motion sensor lighting added in most rooms | ||
+ | *Automation temperature sensors added throughout space | ||
+ | |||
===June 2023=== | ===June 2023=== | ||
*Classroom TV had a rapid unplanned interaction with sudden deceleration due to gravity | *Classroom TV had a rapid unplanned interaction with sudden deceleration due to gravity | ||
Line 14: | Line 32: | ||
===April 2023=== | ===April 2023=== | ||
*Work on standardizing all printers into OctoAnywhere | *Work on standardizing all printers into OctoAnywhere | ||
− | *3/5 Ender 3's | + | *3/5 Ender 3's standardized and online |
+ | |||
===March 2023=== | ===March 2023=== | ||
*Laser hooked back up | *Laser hooked back up |
Latest revision as of 04:58, 20 September 2023
Contents
Office Log
Log of shop projects and general changes within the office space: 3D Printing, Lobbies, Electronics room, Classroom
Month
September 2023
- Laser water loop flow sensor is leaking. Did some temporary repairs
- Identifying the sensor type to order replacement
- Bathroom light fixture replaced
- Kitchen cabinet screwed back to wall (Appeared to be coming loose)
- Excess material purged from Electronics room
August 2023
- Rooftop AC Unit Failure
- Portable AC units spread out in the space as a stopgap
- Putting plan together to replace
- Refrigerator evaporator fan replaced
July 2023
- Replaced ballasts with LED conversions in 4 fixtures
- Motion sensor lighting added in most rooms
- Automation temperature sensors added throughout space
June 2023
- Classroom TV had a rapid unplanned interaction with sudden deceleration due to gravity
- Concrete Pavers added under 3d printers for vibration dampening
- Red Riot repaired and back online
- gMax 2 Pro donated. Work on getting it settled in progress
- Upgraded CCTV system
May 2023
- 4/5 Ender 3's standardized on Pis with screens
- Water connected to fridge
April 2023
- Work on standardizing all printers into OctoAnywhere
- 3/5 Ender 3's standardized and online
March 2023
- Laser hooked back up
February 2023
- Post-Consolidation panic
January 2023
- Consolidation panic