Difference between revisions of "Workspace/officelog"
(Created page with "<h1>Office Log</h1> Log of shop projects and general changes within the office space: 3D Printing, Lobbies, Electronics room, Classroom ==Month== ===June=== *Classroom TV had...") |
(→Month) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
==Month== | ==Month== | ||
− | ===June=== | + | ===September 2023=== |
+ | *Laser water loop flow sensor is leaking. Did some temporary repairs | ||
+ | **Identifying the sensor type to order replacement | ||
+ | *Bathroom light fixture replaced | ||
+ | *Kitchen cabinet screwed back to wall (Appeared to be coming loose) | ||
+ | *Excess material purged from Electronics room | ||
+ | |||
+ | ===August 2023=== | ||
+ | *Rooftop AC Unit Failure | ||
+ | **Portable AC units spread out in the space as a stopgap | ||
+ | **Putting plan together to replace | ||
+ | *Refrigerator evaporator fan replaced | ||
+ | |||
+ | ===July 2023=== | ||
+ | *Replaced ballasts with LED conversions in 4 fixtures | ||
+ | *Motion sensor lighting added in most rooms | ||
+ | *Automation temperature sensors added throughout space | ||
+ | |||
+ | ===June 2023=== | ||
*Classroom TV had a rapid unplanned interaction with sudden deceleration due to gravity | *Classroom TV had a rapid unplanned interaction with sudden deceleration due to gravity | ||
*Concrete Pavers added under 3d printers for vibration dampening | *Concrete Pavers added under 3d printers for vibration dampening | ||
Line 9: | Line 27: | ||
*gMax 2 Pro donated. Work on getting it settled in progress | *gMax 2 Pro donated. Work on getting it settled in progress | ||
*Upgraded CCTV system | *Upgraded CCTV system | ||
− | ===May=== | + | ===May 2023=== |
*4/5 Ender 3's standardized on Pis with screens | *4/5 Ender 3's standardized on Pis with screens | ||
*Water connected to fridge | *Water connected to fridge | ||
− | ===April=== | + | ===April 2023=== |
*Work on standardizing all printers into OctoAnywhere | *Work on standardizing all printers into OctoAnywhere | ||
− | *3/5 Ender 3's | + | *3/5 Ender 3's standardized and online |
− | ===March=== | + | |
+ | ===March 2023=== | ||
*Laser hooked back up | *Laser hooked back up | ||
− | ===February=== | + | ===February 2023=== |
*Post-Consolidation panic | *Post-Consolidation panic | ||
− | ===January=== | + | ===January 2023=== |
*Consolidation panic | *Consolidation panic |
Latest revision as of 03:58, 20 September 2023
Contents
Office Log
Log of shop projects and general changes within the office space: 3D Printing, Lobbies, Electronics room, Classroom
Month
September 2023
- Laser water loop flow sensor is leaking. Did some temporary repairs
- Identifying the sensor type to order replacement
- Bathroom light fixture replaced
- Kitchen cabinet screwed back to wall (Appeared to be coming loose)
- Excess material purged from Electronics room
August 2023
- Rooftop AC Unit Failure
- Portable AC units spread out in the space as a stopgap
- Putting plan together to replace
- Refrigerator evaporator fan replaced
July 2023
- Replaced ballasts with LED conversions in 4 fixtures
- Motion sensor lighting added in most rooms
- Automation temperature sensors added throughout space
June 2023
- Classroom TV had a rapid unplanned interaction with sudden deceleration due to gravity
- Concrete Pavers added under 3d printers for vibration dampening
- Red Riot repaired and back online
- gMax 2 Pro donated. Work on getting it settled in progress
- Upgraded CCTV system
May 2023
- 4/5 Ender 3's standardized on Pis with screens
- Water connected to fridge
April 2023
- Work on standardizing all printers into OctoAnywhere
- 3/5 Ender 3's standardized and online
March 2023
- Laser hooked back up
February 2023
- Post-Consolidation panic
January 2023
- Consolidation panic