Mostly Encompassing Inconclusive List

Metal Shop Construction

  • Divider
    • Finish bolting
    • Deck upper shelves
  • Electrical
    • A: Green workstation 2-gang, Orange rack 2x 2-gang 110v, Exit Sign
    • B: Side Concrete wall, 2x 2-gang 110v
    • C: Dedicated Lathe/Mill 110v
    • D: Overhead outlet, lighting
    • D: 220v Dedicated Concrete wall
    • Subpanel cross connect
  • Modify center bench
  • Welder Bullpen
  • Blast Cabinet
  • English Wheel/Pipe Bender mount
  • Install metal lights

Laser

  • Vent pipe
  • Blower mounting
  • Dedicated 20A for Laser + Blower
    • Junction to outlet drop
    • Panel to Junction
  • Dedicated 20A for chiller + comp
    • Junction to outlet drop
    • Panel to Junction
  • Catwalk for maintenance

Metal Shop

  • Tool Boxes
    • Consolidate tools into the gray rolling toolbox
    • Organize Husky toolbox if it's ours
    • Re-use Grey Tool Box for lathe tools/parts
  • Rolling Tools
    • Roll tools over to metal shop near rough locations
  • Walls
    • Peg board for common tools
    • Bullpen for 18v tools
  • Bench Grinders
    • Assemble stands and grinders in proper location.
  • Metal Storage
    • Small sheet cubbies(12"x36",24"x36")
    • Small bar cubbies( 3"x36")
    • Oversize Storage (?"x?")
    • Small parts bins
      • Aluminum
      • Steel
      • Alloys (brass/bronze/etc)
      • Aluminium (Metric aluminum)

Mechanisms

  • Walls
    • 10' 4-1/2" square with hallway side having 18" partial walls
    • Frame out corner
    • Drywall
  • Electrical
    • Drop from ceiling
    • 3 2-gang outlets in office, 1 overhead
    • 8' Led light from ceiling, outlet with switch.

Wood Shop Prep

* Encapsulation ** Upper Wall in Metal Shop ** Moving lights over - Sanding Bench ○ Shorten so spindle tops are about 38" ○ Change up storage layout - Jointer

- Planer ○ Combine 220v and 110v cables ○ Cable wrap - Lathes ○ Break down old laser stand and store lathe ○ Shrink other lathe bench - Tool Bench ○ Kill arm of U-Bench ○ Reorganize Ryobi tools ○ Label bins underneath - Dust Collection ○ Move central controller to upright by heavy tools ○ Move Blue controller near CNC ○ Move dust collectors physically ○ Add 3HP control box ○ Finish sealing pipe ○ Run control wires ○ Build control panel § "tree" for each gate § Green/Red lights for power ○ Run overhead pipe for drywall side ○ 3HP under pallet rack for heavy tools, saws, and sanding ○ 2HP for CNC - Air System ○ Move and mount compressor ○ Run pipe to metal shop § Drop by Mech CNC § Drop on far side of Lathe

○ Run pipe along first overhead rail on woodshop side § Drop by compressor corner § Drop by edge of heavy tools § Drop by back door (low) - Electrical Changes ○ Move SawStop forward and add new motor cable (blocked by aluminum) ○ Center wood shop lights ○ Add Compressor circuit ○ Add 220v 6-20R to upright with control box ○ Add addl' 4' lights § 1 Above member storage § 2 Above Logo § 2 Above CNC § 1 on Bret bench ○ Add 3 electrical boxes on new circuit on roof for fans. - Layout ○ Move Worktables ○ Stack Workstations ○ Pile shelves in Mechanism's office for now - Storage ○ Miter Wood Rack ○ Organization of storage shelves ○ Dump of crap from storage room ○ Set up new scrap storage § 2x4' shelf in storage area for small flat stock § 4' deep short boards ○ Break down aluminum ○ Mezzanine § Deck above member storage with OSB § Catwalk across front wall § Tear down hang printer frame - Other ○ Ceiling Fans ○ 6-7' fans, 3 total ○ One over CNC area ○ One over Miter ○ One behind heater