User:Ryan
Chasing geese and finding ducks. Co-Director and general doer of things.
Contents
Mostly Encompassing Inconclusive List
Metal Shop Construction
- Divider
- Finish bolting
- Deck upper shelves
- Electrical
- A: Green workstation 2-gang, Orange rack 2x 2-gang 110v, Exit Sign
- B: Side Concrete wall, 2x 2-gang 110v
- C: Dedicated Lathe/Mill 110v
- D: Overhead outlet, lighting
- D: 220v Dedicated Concrete wall
- Subpanel cross connect
- Modify center bench
Welder BullpenBlast Cabinet- English Wheel/Pipe Bender mount
- Install metal lights
Laser
Vent pipeBlower mountingDedicated 20A for Laser + BlowerJunction to outlet dropPanel to Junction
Dedicated 20A for chiller + compJunction to outlet dropPanel to Junction
- Catwalk for maintenance
Metal Shop
- Tool Boxes
- Consolidate tools into the gray rolling toolbox
- Organize Husky toolbox if it's ours
- Re-use Grey Tool Box for lathe tools/parts
- Rolling Tools
- Roll tools over to metal shop near rough locations
- Walls
- Peg board for common tools
- Bullpen for 18v tools
- Bench Grinders
- Assemble stands and grinders in proper location.
- Metal Storage
- Small sheet cubbies(12"x36",24"x36")
- Small bar cubbies( 3"x36")
- Oversize Storage (?"x?")
- Small parts bins
- Aluminum
- Steel
- Alloys (brass/bronze/etc)
- Aluminium (Metric aluminum)
Mechanisms
- Walls
10' 4-1/2" square with hallway side having 18" partial wallsFrame out corner- Drywall
- Electrical
- Drop from ceiling
- 3 2-gang outlets in office, 1 overhead
8' Led light from ceiling, outlet with switch.
Wood Shop Prep
* Encapsulation ** Upper Wall in Metal Shop ** Moving lights over - Sanding Bench ○ Shorten so spindle tops are about 38" ○ Change up storage layout - Jointer
- Planer ○ Combine 220v and 110v cables ○ Cable wrap - Lathes ○ Break down old laser stand and store lathe ○ Shrink other lathe bench - Tool Bench ○ Kill arm of U-Bench ○ Reorganize Ryobi tools ○ Label bins underneath - Dust Collection ○ Move central controller to upright by heavy tools ○ Move Blue controller near CNC ○ Move dust collectors physically ○ Add 3HP control box ○ Finish sealing pipe ○ Run control wires ○ Build control panel § "tree" for each gate § Green/Red lights for power ○ Run overhead pipe for drywall side ○ 3HP under pallet rack for heavy tools, saws, and sanding ○ 2HP for CNC - Air System ○ Move and mount compressor ○ Run pipe to metal shop § Drop by Mech CNC § Drop on far side of Lathe
○ Run pipe along first overhead rail on woodshop side § Drop by compressor corner § Drop by edge of heavy tools § Drop by back door (low) - Electrical Changes ○ Move SawStop forward and add new motor cable (blocked by aluminum) ○ Center wood shop lights ○ Add Compressor circuit ○ Add 220v 6-20R to upright with control box ○ Add addl' 4' lights § 1 Above member storage § 2 Above Logo § 2 Above CNC § 1 on Bret bench ○ Add 3 electrical boxes on new circuit on roof for fans. - Layout ○ Move Worktables ○ Stack Workstations ○ Pile shelves in Mechanism's office for now - Storage ○ Miter Wood Rack ○ Organization of storage shelves ○ Dump of crap from storage room ○ Set up new scrap storage § 2x4' shelf in storage area for small flat stock § 4' deep short boards ○ Break down aluminum ○ Mezzanine § Deck above member storage with OSB § Catwalk across front wall § Tear down hang printer frame - Other ○ Ceiling Fans ○ 6-7' fans, 3 total ○ One over CNC area ○ One over Miter ○ One behind heater